MARINE
Harbors & Ports

Abu Qir Container Terminal
The project is one of the Mega Maritime projects in Alexandria, Egypt. KC plays an important role in the site supervision and design review of this huge project.

Berth 85, Alexandria Port
Participated in the consultancy services for designing and supervising on construction a multi- purpose berth, length of 400 m and a depth of 14 m, in Alexandria port (berth 85)

Port Said ports Authority
Participated in the feasibility Study, Design, Tender document and Supervision of the Trailers and Vehicles Parking Area at Port said East Port.

Multi Purpose terminal
Participated in the New multi purpose terminal at Damietta Port

General Authority of Alexandria Ports
Participated in Pre-feasibility study’s for New multi-purpose terminal berths 55-62 Alexandria Port

Saudi Ports, KSA
Participated in Study of The Evaluation and Development of the Saudi Ports of Jubail Commercial Port, Yanbu Commercial Port, Jazan and Dhaba ports

Yanbu Port
Participated in Development and construction of Yanbu Port. The port area contains a large number of oil refineries, petrochemical factories, and other industrial

Dammam Dry Port
Participated in Study of Development of the Dammam Dry Port

Port Sudan
Participated in Development of Container North Terminal Project at Sudan Port

Sierra Leon Container Terminal
Participated in Development of Freetown Container Terminal that integrated with facilitating Sierra Leone Imports and exports

Togo Lomé Port
Participated in Development of Container Terminal of Togo Lomé port which is a logistics platform for shipping companies and the main exit border for Burkina Faso exports

Sokhna Jetty
Team Leader for Construction supervision of the Jetty for the Liquid Bulk of Sokhna Port General Authority Suez Canal Economic Zone. As well as providing technical reports and solving technical problems